Waterproofing bid estimating, without the grind.
The waterproofing number is set less by the membrane SF than by the detailing — penetrations, terminations, corners, transitions — where labor and leak risk concentrate. Drop in your package and get back a cited first-pass: membrane by SF with the system + warranty that dictate mils/coats, detailing priced explicitly, the below-grade/water-table and AVB-scope flags, and the RFIs that keep a waterproofing bid from losing on a corner.
REVIEWED
Priced for the way waterproofing is actually bid.
The engine reads your package and flags exactly what bites waterproofing estimators — before it costs you.
Governing codes named: ASTM C836/C1305 (fluid-applied membrane + crack-bridging), D6135/D1970 (self-adhered sheet membranes), NRCA/SWRI (waterproofing + sealant install refs), manufacturer system spec (warranty, prep, detailing — governs), IBC Ch. 18/17 (below-grade dampproofing/waterproofing + special inspection).
Line-item groups your bid breaks into: surface prep + substrate acceptance; below-grade waterproofing (foundation walls, slabs, blindside); plaza/split-slab/roof-deck/planter; traffic/pedestrian/vehicular deck coatings; air/vapor barrier; joint sealants + backer rod + primer; expansion-joint systems; drainage/protection board + insulation; flashings, terminations, penetration detailing; flood/leak testing + warranty.
The waterproofing risks ranked: detailing/transitions (penetrations, terminations, envelope transitions are where leaks + labor concentrate — the #1 gap); substrate acceptance (wet/uncured/rough substrates void warranties); air-barrier scope split (a frequent gap + leakage liability); below-grade water table (hydrostatic conditions change method + cost); warranty-driven system; flood-test failures (rework).
The RFIs drafted (verbatim): "Confirm the waterproofing system per condition (fluid-applied vs. sheet vs. bentonite) and the required warranty term + manufacturer inspection?" "Below-grade: water table / hydrostatic head, and positive-side vs. blindside application?" "Air/vapor barrier: in the waterproofing scope or a separate envelope contractor, and how do they tie together?"
Everything waterproofing needs, structured.
Line-item groups
Governing codes
Units of measure
The risks that usually bite
Run this on your own waterproofing package.
30 minutes. Bring a real set — a below-grade foundation, a plaza/split-slab deck, or a leak-prone envelope — and watch the cited line items, the detailing/transition flags, and the AVB-scope RFIs on your actual drawings.