Geotechnical and deep-foundation bid estimating, without the grind.
The deep-foundation number is set less by the count than by what the ground does between the pile and the plan tip elevation — the bond zone, the caving soils, the grout that disappears into fractures. Drop in your package and get back a cited first-pass: elements derived from the structural loads with the math shown, production and shift counts built from stated planning rates, the grout volume calculated from annular space with an honest waste factor, and the RFIs that keep a deep-foundation bid from losing on the conditions.
REVIEWED
Priced for the way geotechnical / deep foundations is actually bid.
The engine reads your package and flags exactly what bites geotechnical / deep foundations estimators — before it costs you.
Governing codes named, not guessed: FHWA-NHI-05-039 (micropile design and construction, Type A/B/C/D classification), FHWA-RD-89-043 (soil nail and global slope stability), AASHTO LRFD (bridge and DOT deep-foundation loads), ACI 336.1/336.3 (drilled shafts + cast-in-place deep foundations), ASTM D1143/D3689 (compressive + tensile load tests), ASTM D5882 (low-strain integrity), IBC Ch. 18 (soils and foundations), OSHA 1926 Subpart P (excavation and trench safety).
Line-item groups your bid breaks into: mobilization + demob; drilling and primary installation; grout from annular space; steel casing, reinforcement + centralizers; permanent materials; corrosion protection; testing (proof, verification, integrity, performance); drill tooling + consumables; equipment owned/rented + fuel; traffic control, access + vibration monitoring; contingency. For soil nail walls, drilling/nail installation, initial shotcrete, final facing, drainage and testing are SEPARATE groups.
The deep-foundation risks ranked: global slope stability not analysed before wall selection; grout overrun in fractured rock or karst; differing site conditions + obstruction disputes; load-test failure and production hold points; casing length and stick-up missed in the takeoff; access, headroom, + vibration limits from adjacent structures.
The RFIs drafted (verbatim): "What are the acceptance criteria for proof/verification load tests, who approves and witnesses results, and are there hold points requiring engineer presence before production drilling resumes?" "Is vibration monitoring required during drilling (especially percussive down-the-hole or casing advancement) — who establishes the pre-construction baseline survey, what are the trigger/action levels, and who can halt operations?" "How are obstructions defined for T&M billing — by material type (IBC rock definition), drill refusal criteria (blow count, penetration rate), or contractor judgment — and who authorizes T&M?"
Everything geotechnical / deep foundations needs, structured.
Line-item groups
Governing codes
Units of measure
The risks that usually bite
Run this on your own deep-foundation package.
30 minutes. Bring a real set — a micropile package, a soil nail wall, or a job with thin geotech data — and we'll walk the derived quantities, the grout calculation, the differing-site-conditions flags, and the draft RFIs on your actual drawings.