Fire suppression bid estimating, without the grind.
The sprinkler number is set less by the protected SF than by the hazard classification, the water supply that forces a fire pump, and the ceiling type that sets the heads. Drop in your package and get back a cited first-pass: sprinkler budgeted by hazard class but bid from hydraulic design, the fire-pump/NFPA-20 flag, and the RFIs that keep a fire-protection bid from missing the biggest cost line.
REVIEWED
Priced for the way fire suppression is actually bid.
The engine reads your package and flags exactly what bites fire suppression estimators — before it costs you.
Governing codes named: NFPA 13 (sprinkler installation — the governing standard; 13R/13D for residential), NFPA 14 (standpipe + hose), NFPA 20 (fire pumps), NFPA 25 (ITM — inspection, testing, maintenance for existing/tenant work), NFPA 24 (private fire service mains), FM Global/local fire marshal (insurer + AHJ requirements, often govern hazard classification).
Line-item groups your bid breaks into: hydraulic design + shop drawings + permit (NICET); fire service entrance — backflow, riser, FDC; fire pump + controller (if required by pressure); overhead distribution — mains, branch lines, drops; sprinkler heads by hazard/type/finish; standpipes + hose valves (NFPA 14); underground fire main (NFPA 24); specialty systems — pre-action, dry, clean-agent, kitchen (NFPA 96/2001); testing, flushing, AHJ final inspection.
The fire-suppression risks ranked: fire pump requirement (whether water supply forces an NFPA 20 pump is the biggest cost swing — hinges on the flow test); hazard classification (storage/extra-hazard drastically increases density, pipe, heads); ceiling/head coordination (concealed vs. exposed); underground main scope split; seismic bracing (NFPA 13); AHJ/permit + design.
The RFIs drafted (verbatim): "Confirm the hazard classification (NFPA 13 light/ordinary group 1-2/extra hazard) per area and the design density?" "Water supply: is there a recent flow test, and does the available pressure require a fire pump (NFPA 20)?" "Ceiling type by area (exposed grid, concealed lay-in, hard-lid) — which sets head type, finish, and drop count?"
Everything fire suppression needs, structured.
Line-item groups
Governing codes
Units of measure
The risks that usually bite
Run this on your own fire-suppression package.
30 minutes. Bring a real set — a storage/extra-hazard occupancy, a job without a recent flow test, or one needing a fire pump — and watch the cited line items, the hazard + water-supply flags, and the hydraulic-design RFIs on your actual drawings.