Electrical bid estimating, without the grind.
The electrical estimate isn't a $/SF number — it's the gear count, the raceway and conductor lengths, the lighting-controls energy-code scope, and the equipment-connection demarcation that decides the number. Drop in your package and get back a cited first-pass: devices and fixtures by schedule, feeders and gear from the one-line, the arc-flash and controls scope flags, and the RFIs that keep you from under-scoping the code-mandated controls.
REVIEWED
Priced for the way electrical is actually bid.
The engine reads your package and flags exactly what bites electrical estimators — before it costs you.
Governing codes named: NFPA 70 (NEC — the governing install standard), NFPA 70E (arc-flash/safety), NECA 1 (workmanship), IEEE (power/grounding/1584 arc-flash), UL (listing), IECC/ASHRAE 90.1 (energy-code lighting controls), local AHJ amendments.
Line-item groups your bid breaks into: temporary power; service+distribution (gear/panels/transformers/feeders); branch rough-in (conduit+wire); devices; lighting+lamps+controls; lighting controls/energy-code compliance; grounding+bonding; fire alarm; life-safety/emergency power+egress; equipment connections; testing/commissioning/arc-flash.
The electrical risks ranked: lighting controls under-scoped (energy-code compliance routinely missed); gear/switchgear lead time + volatility; utility coordination/service; equipment-connection scope gap (who furnishes disconnects); fault-current/arc-flash study assumed in or out; fixture substitution/availability.
The RFIs drafted (verbatim): "Is the arc-flash / short-circuit / coordination study (IEEE 1584) in our scope?" "Lighting controls scope: what level of ASHRAE 90.1 / IECC compliance (occupancy, daylight harvesting, receptacle control)?" "Fire alarm and low-voltage/data — in our scope or separate contractors, and where's the demarcation?"
Everything electrical needs, structured.
Line-item groups
Governing codes
Units of measure
The risks that usually bite
Run this on your own electrical package.
30 minutes. Bring a real set — a service upgrade, a warehouse with strict lighting controls, or a mixed-use build — and watch the cited line items, the code-compliance flags, and the gear lead-time risks on your actual drawings.