Curtain wall & glazing bid estimating, without the grind.
The glazing number is set less by the wall SF than by the system type (stick vs. unitized), the AAMA performance class, and the delegated engineering/mock-up that's too easy to miss. Drop in your package and get back a cited first-pass: curtain wall by SF of opening, glass makeup per ASTM E1300, the wind-pressure and air/water-barrier flags, and the RFIs that keep a glazing bid from losing on the system, not the glass.
REVIEWED
Priced for the way curtain wall / glazing is actually bid.
The engine reads your package and flags exactly what bites curtain wall / glazing estimators — before it costs you.
Governing codes named: AAMA (aluminum framing + curtain-wall performance standards), ASTM E283/E331/E330 (air infiltration, water penetration, structural test methods), ASCE 7 (wind + component-and-cladding pressures), IBC Ch. 24 (glass + glazing: safety, sloped, guards), ASTM E1300 (glass thickness/load resistance), IGMA/IGCC (insulating-glass certification).
Line-item groups your bid breaks into: shop drawings + delegated structural engineering; performance mock-up + testing; curtain wall/storefront systems (stick vs. unitized); windows/entrances/automatic doors; glass IGU/laminated/spandrel/low-E; sunshades/louvers/metal panels; perimeter sealants + air/water barrier tie-in; anchors + embeds; field testing (AAMA 501.2 water) + hoisting/crane.
The glazing risks ranked: delegated engineering + mock-up (structural engineering, shop drawings, and performance mock-ups are real cost often missing from the base number); glass lead time + escalation (IGUs and coated/laminated glass); air/water barrier tie-in (a classic scope + leakage-liability gap); wind pressure/anchor design (under-designed anchors for ASCE 7 C&C); access/hoisting (crane cycles + swing-stage for unitized vs. stick-built).
The RFIs drafted (verbatim): "Is delegated structural engineering + shop drawings in our scope, and is a performance mock-up + field testing (ASTM E1105 / AAMA 501.2) required?" "Glass makeup: IGU configuration, low-E coating, laminated/safety glazing (IBC Ch. 24), spandrel — and any acoustic/security requirement?" "Air + water barrier tie-in: how does the wall system interface with the adjacent envelope, and whose scope is the transition membrane?"
Everything curtain wall / glazing needs, structured.
Line-item groups
Governing codes
Units of measure
The risks that usually bite
Run this on your own glazing package.
30 minutes. Bring a real set — a unitized curtain wall, a storefront build, or a job thin on mock-up/engineering detail — and watch the cited line items, the delegated-engineering flags, and the air/water barrier RFIs on your actual drawings.